Please use this identifier to cite or link to this item: http://repository.ukrida.ac.id//handle/123456789/50
Full metadata record
DC FieldValueLanguage
dc.contributor.authorSoenandi, Iwan-
dc.date.accessioned2019-03-18T03:22:49Z-
dc.date.available2019-03-18T03:22:49Z-
dc.date.issued2018-11-19-
dc.identifier.isbn1978-774X-
dc.identifier.urihttp://repository.ukrida.ac.id:80/handle/123456789/50-
dc.description.abstractThis paper reports findings of a optimization study of shock absorber assembly line using computer simulation software. The shock absorber assembly line feeds shockers to the motorcycle assembly line. The assembly line simulated in this project is located at an OEM for the largest motorcycle manufacture in Indonesia. In this paper, results of simulation are presented from two scenarios. The first is the original layout of the system. The second simulation is the suggested optimization modifications. Data was gathered and evaluated to determine the necessary parameters to be used. The new demand required the OEM to increase its capacity by 100 shock absorbers per day. After implementing the proposed model the daily output increased by 120 shock absorbers per day. The highlights of our analysis was this increase in production rate by balancing the flow process cycle time with new allocation resources.en_US
dc.language.isoen_USen_US
dc.subjectComputer simulationen_US
dc.subjectAssembly lineen_US
dc.titleOptimization of A Shock Absorber Assembly Line Using Simulationen_US
dc.typeJournalen_US
Appears in Collections:Form review

Files in This Item:
File Description SizeFormat 
Turnitin ISIEM 2013.pdf2.57 MBAdobe PDFView/Open
ISIEM 2013.pdf4.67 MBAdobe PDFView/Open


Items in UKRIDA Repository are protected by copyright, with all rights reserved, unless otherwise indicated.