Please use this identifier to cite or link to this item: http://repository.ukrida.ac.id//handle/123456789/1237
Full metadata record
DC FieldValueLanguage
dc.contributor.authorIrfanto, Ryobi-
dc.date.accessioned2022-04-06T04:03:06Z-
dc.date.available2022-04-06T04:03:06Z-
dc.date.issued2022-04-01-
dc.identifier.issn1411-9331-
dc.identifier.issn2549-7219-
dc.identifier.urihttp://repository.ukrida.ac.id//handle/123456789/1237-
dc.description.abstractConstruction projects are inseparable from their unique management. The unique management of construction projects makes it difficult to maintain their quality. One of the tools to measure quality in project management is the Pareto chart. Pareto chart is a statistical technique that is usually used for decision making based on the frequency of events compared to the causes of events. This research was conducted to analyze the causes of repair work on project X by using Pareto chart. The conceptual framework used in this study is based on two approaches, namely literature and field observations. The main literature for analysis is the Pareto chart then field data collection on each component first which is then categorized based on the type of work. After the data is categorized, a Pareto chart will be made from the data. The processing results obtained two dominant types of errors in the casting work, namely cracks and unevenness of the casting results. Cracks and unevenness of the casting results can be overcome by the chipping method then followed by grouting if necessary. The chipping method is used to repair porous concrete or flatten the casting if it swells, and the grouting method to fill cracks and chipping results with a mixture of cement and water until the surface becomes flat and the casting work results are better.en_US
dc.language.isoiden_US
dc.publisherFakultas Teknik Universita sKristen Maranathaen_US
dc.relation.ispartofseriesVolume 18;Nomor 1 April 2022-
dc.subjectCause of Repairen_US
dc.subjectPareto Charten_US
dc.subjectCasting Repairen_US
dc.titleAnalisis PenyebabPekeijaan Perbaikan Pengecoran Proyek X dengan Pareto Charten_US
dc.title.alternativeAnalisis PenyebabPekeijaan Perbaikan Pengecoran Proyek X dengan Pareto Charten_US
dc.typeJournalen_US
Appears in Collections:Journal

Files in This Item:
File Description SizeFormat 
Artikel JTS Vol 18 No 1 (2022) Hal 106-117 - Ryobi Irfanto.pdfTHE ANALYSIS CAUSE OF CASTING REPAIR WORK WITH PARETO CHART IN PROJECT X631.73 kBAdobe PDFView/Open


Items in UKRIDA Repository are protected by copyright, with all rights reserved, unless otherwise indicated.